![]() The restrooms located on the second level before security have also been overhauled and now feature long and wide stalls substituting the former narrow ones. Installation of tree branches inlay in backlit panels made of frosted glass in the counters amplifies the aesthetics. The old counters have been replaced with the new ones incorporating a sleek design in stone and tile. ![]() Self check-in kiosks have already been relocated and placed in a row facing the ticket counters as part of the makeover. ![]() The green Black Hills forest serves as the inspiration for the design of the improved terminal building. Other features involve replacement of the current windows with new ones and resurfacing of the building's exterior. Work further includes relocation of rental car counters into their own wing, shifting of the gift shop behind security and expansion of the security check point to house three lanes and body scanners. The facility will feature seven boarding gates after the overhaul which is more than the existing number with jet bridges serving every gate. The project includes upgrades to the terminal's interior portion with creation of new restrooms and a new rooftop patio accessed from a refurbished and renovated restaurant. ![]() Construction work is underway on a $20.5 million makeover of the terminal in Rapid City Regional Airport in South Dakota, US. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |